Quality control: Test Test Standard Properties Formaldehyde Emission EN 717- 1 < 0,05 ppm Suface Resistance to Stains EN 438 - 2,15 Level 5, no visible surface changes
Please transport Kronotex flooring carefully and in their original packaging. Use open cartons before starting a new one. Large quantities should be stored in their original cartons in order to protect the product from the effects of the exterior environment
Prior to laying, please store KRONOTEX flooring horizontally in its unopened packaging at room temperature for a minimum of 48 hours (minimum 18° C) so that the planks have enough time to reach room temperature.
In order to ensure that you will enjoy years of pleasurable use from your floor, please go through this brief checklist prior to laying. 1. Examine, wether between floor and door is enough space (at least 1 cm) so that after
The installation should be performed at an ambient temperature of at least 18° C, a ground temperature of at least 15° C and relative humidity of 50% (minimum) and 75% (maximum). Please do not aerate the space during installation.
If the space contains vertical surfaces such as heating pipes or room dividers, cut the planks to the correct length first. Then lay the pieces next to the places where they are to be installed, measure the recesses with a measuring stick
Kronotex flooring can of course be installed with full-surface gluing. However, slab surface properties must be determined with extreme precision beforehand, and it must also be decided precisely hich professional
Kronotex flooring is not only hygienic but also very easy to look after. Here is some advice: 1. Sweep the dry floor with a soft broom or use a vacuum cleaner. 2. Marks and dirt can be wiped off with a slightly damp cloth, following the grain
The sub-floors must be absolutely dry, level, firm, and clean. Minor unevenness can be compensated for by using underlay material (sound insulation). Unevenness of more than 3 mm in a one metre area should be sanded